  1. Date: Sun, 16 Aug 92 14:58:03    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #116
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Sun, 16 Aug 92       Volume 15 : Issue 116
  10.  
  11. Today's Topics:
  12.                ACRV/Soyuz P # of Passengers (5 msgs)
  13.               Energya and Freedom and Soyuz ACRV and...
  14. NASA statement on Earth Data System proposals [NTE 92-71] (Forwarded)
  15.              SPS feasibility (WAS: SPS fouling astronomy)
  16. U.S. Go'vt Procurement (was: Energiya's role in Space Station assem) (2 msgs)
  17.  
  18.     Welcome to the Space Digest!!  Please send your messages to
  19.     "space@isu.isunet.edu", and (un)subscription requests of the form
  20.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  21.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  22.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  23. ----------------------------------------------------------------------
  24.  
  25. Date: 15 Aug 92 20:57:01 GMT
  26. From: Greg Moore <strider@acm.rpi.edu>
  27. Subject: ACRV/Soyuz P # of Passengers
  28. Newsgroups: sci.space
  29.  
  30. In article <14AUG199223295140@judy.uh.edu> seds%cspara.decnet@Fedex.Msfc.Nasa.Gov writes:
  31. >In article <1992Aug14.152325.29323@iti.org>, aws@iti.org (Allen W. Sherzer) writes...
  32. >>In article <h-aym4#@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  33. >> 
  34. >
  35. >You may be right here Allan, The Soyuz is usually pretty much automated.
  36. >
  37.     So is the shuttle.  But we still use two flight-qualified 
  38. astronauts.
  39.  
  40. >>In ten years of operation Shuttle has not come down in price very much.
  41. >>As to additional flights reducing cost, it won't happen since Shuttle if
  42. >>flying at maximum rate now and CAN'T fly any more.
  43. >
  44. >What is your source for this statement Allan. The maximum flight rate for the
  45. >Shuttle is about one per month.  This comes from over three years of reading
  46. >the daily reports of shuttle launch turn around operations.  Even before the
  47. >addition of Endeavour there were times when all Three Shuttles were stacked
  48. >with two on the pad and one in the VAB.  The constraint on the launch rate 
  49. >today is the payload processing from what I have seen.  Any comment from the
  50. >Shuttle ops people out there?  Notice another thing Allan the overall yearly
  51. >costs involved in Shuttle ops do not change much no matter how many or few
  52. >that have been launched in the past few years.  By far most of the cost is 
  53. >associated in maintaining the standing armies at the centers that support the
  54. >Shuttle.  A ten  launch per year rate is certainly possible now.  Also I have
  55. >not heard any comments from you regarding the greaat increase in Shuttle 
  56. >reliability and schedule.  It is funny that around here there is grumbling
  57. >about that fact in that researchers cannot count on a delay anymore when
  58. >their schedules slip.
  59. >> 
  60. >>A government report (I think it was 'Launch Options for the Future') said
  61. >>that there is plenty of facilities available to greatly increase the
  62. >>rate of Atlas launches. HL Delta goes up from an unused launch complex and
  63. >>all the costs you mention are included.
  64. >> 
  65. >I wonder where all of these facilities are at. They certainly aren't at KSC.
  66. >Both MacDac pads (17A and 17B) are in constant use with almost a one shot
  67. >per month average off of the pads. Also both Atlas pads (36A and 36B) are now
  68. >operational.  One of the two Atlas pads have been recently brought back on line
  69. >after over twenty years of non-use. The old Titan pads from the Gemini days
  70. >are gone. The old Atlas pads from the Mercury days are gone, so to Get the
  71. >HL Delta or Atlas going will require new pads and probably new fire control
  72. >centers.  Also, new clean rooms and payload integration facilities at these new
  73. >pads will have to be built.  It ain't all there Allan.
  74. >
  75.     This more clearly illustrates my point Allen.  You have to include
  76. the use of clean rooms and pif's etc.  They are not always available.        
  77. (I am not talking building costs, those are one shot and are amortized over
  78.  
  79. the years, becomimg I would assume a small part of the cost).  BUt
  80. for more flights you have to increase the number of "standing armies" of
  81. technicians, the number of facilities (so that at least one is always
  82. available at the pad you want to use.
  83.  
  84. >
  85. >> 
  86. >>The relevant government reports says larger launch rates can be sustained.
  87. >>This will provide better utilization of ground facilities which will reduce
  88. >>costs even more.
  89. >>
  90. Up to a point.  This is like saying that the more cars that use a toll-bridge
  91. the better, since it makes money faster.  Until you reach the carrying load
  92. of the bridge and it now takes twice as long for each person to pay and get
  93. across.  Then your profit drops in half.
  94.  
  95. >see the above
  96. >
  97. >
  98. >
  99. >Does this mean I can bid my Saturn Derived Vehicle (SDV) ?
  100. >
  101.     If you can build it (and fly it) tehy will come! (with contracts
  102. in hand!)
  103.  
  104. >Dennis, University of Alabama in Huntsville
  105. >
  106.  
  107.  
  108. -- 
  109. <------------------------------------------------------------------------->
  110. Greg d. Moore                  |  Strider@acm.rpi.edu
  111. Green Mountain Software        |  "All that is gold does not glitter."  
  112. Carpe Diem                     | 
  113.  
  114. ------------------------------
  115.  
  116. Date: 15 Aug 92 21:12:59 GMT
  117. From: Greg Moore <strider@acm.rpi.edu>
  118. Subject: ACRV/Soyuz P # of Passengers
  119. Newsgroups: sci.space
  120.  
  121. In article <1992Aug15.143945.3204@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  122. >In article <14AUG199223295140@judy.uh.edu> seds%cspara.decnet@Fedex.Msfc.Nasa.Gov writes:
  123. >
  124. >>Allan you have still not addressed with numbers the propostion that the
  125. >>Shuttle will become MORE useful as the return of large payloads grows more
  126. >>common in the SSF era.
  127. >
  128. >The biggest payload identified is about 15K pounds. The only larger payload
  129. >(LDEF) can be easilly broken up in LEO and individual experiments sent back
  130. >with new ones added (saving launch costs).
  131. >
  132. >A simple return craft can be built to return these payloads in a suitable
  133. >environment. Estimate the cost of this anyway you want.
  134. >
  135.     Hmm, sorry, I don't have my figures for EVA handy.  I know
  136. it is more than non-EVA time.  Besides, NASA has been doing everything
  137. that it can to REDUCE EVA time.  Hmm, will you throw in the cost of 
  138. the hard suit too?  Pretty please? :-)
  139.  
  140.     [stuff deleted]
  141. >
  142. >>A ten  launch per year rate is certainly possible now.  
  143. >
  144. >That is a bit less than the one per month you quote above and also
  145. >unrealistic. Ten flights has only been acheived one time and it ended
  146. >with Chalenger.
  147. >
  148. >>Also I have
  149. >>not heard any comments from you regarding the greaat increase in Shuttle 
  150. >>reliability and schedule.
  151. >
  152. >Since it achieves less reliability than commercial systems costing a fraction
  153. >as much I don't think it is anything to boast about. Let's see it go on
  154. >for a few years.
  155. >
  156.     How? If you kill it?  Compare the reliability of the first 50 flights
  157. of the shuttle with the first 50 of any booster.  When we get more 
  158. shuttle flights under our belt, we use that as a better data set.
  159.     (BTW, I am in agreement with at least one thing: "Man-rating" is
  160. probably a myth that only adds to cost.)
  161.  
  162. >>I wonder where all of these facilities are at. They certainly aren't at KSC.
  163. >
  164. >HL Delta would use Complex 37. As for Atlas, the report I mention does
  165. >say that the additional six flights can be acheived.
  166. >
  167.     Ok, so, let's see... under YOUR plan, you need at least 2 Soyuz
  168. flights to recrew that station, 4 times a year.. gives 8 flights.  Ok,
  169. so where do the extra 2 come from?  Given my numbers of min 3 flights
  170. gives you 12 flights a year, twice the 6 you quote.  Now, where do we
  171. launch the Progress and other resupply flights?
  172.  
  173. >
  174. >If I'm wrong, give me the cost of a new Atlas facility and I'll add it
  175. >to my estimates.
  176. >
  177.     Ok, giving it MAX capacity (which until I see numbers I think is
  178. pushing things) of 12 flights a year, that eats up your Soyuz and Progress
  179. flights.  And if you can't meet 12 flights a year?  What then?  What happens
  180. when an Atlas is grounded (for whatever reason, I believe that you are
  181. reasonable enough to admit that sometimes ANY booster can be delayed 
  182. somewhat) on the pad you're planning on launching your resupply mission?
  183. Commadeer a commericial launch, or force a commercial launch to wait
  184. while you rebuild the stack to include your resupply materials instead
  185. of their cargo?  Who gets first dibs?  Government (with a crew in orbit)
  186. or industry?  Both have paid for services.  Ultimately both will get them,
  187. BUT one has a crew waiting.
  188.  
  189. >>Also, new clean rooms and payload integration facilities at these new
  190. >>pads will have to be built.  It ain't all there Allan.
  191. >
  192. >What isn't there is included in the estimated development costs. Like I
  193. >said, the HL Delta designers know what they are doing.
  194. >
  195.     I've neer seen you quote the money to be spend on intergration
  196. facilities, etc.  If the number you have for HL Delta is not just for
  197. the rocket, but for everything else, Pad, integration facilities, etc,
  198. I'd appreciate it if you could brek them out and post them.
  199.  
  200. >Look, McDonnell Douglas offered the government 20 HLV flights at a fixed
  201. >price. If the government signed, they wouldn't pay a penny until the
  202. >flights happened. If the flights didn't happen or the launcher didn't
  203. >meet specs then the government doesn't pay.
  204. >
  205.     Oh Allen? What do we need 20 flights for?  Not to launch
  206. Fred, that can be done in 4 or 5.  What else?  Not to launch or 
  207. return large payloads according to you.
  208.     So, can MacDac do it for only 4 or 5 launches?
  209.  
  210. >This is EXACTLY the way Boeing operates.
  211. >
  212. >>McDonnel Douglas is trying, but their cash position is not near as safe as
  213. >>Boeing and I guarantee that the stockholders will not authorize the 
  214. >>expenditures of large amounts of company cash even if the government decides
  215. >>to say they will guarantee the number of flights.  
  216. >
  217. >And yet they made the offer. Perhaps the executives at McDac know more
  218. >than you about finance and what the stockholders will go for.
  219. >
  220. >>BUT there ain't no way on God's green earth that
  221. >>any of these guys would go for a contract that says "no deliver no pay"
  222. >>without a hefty insurance policy.
  223. >
  224. >I'm sure that is true. The operative word is 'insurance'. Launch companies
  225. >offer a wide range of services from 'we'll do our best but your on your own'
  226. >to 'we're your one-stop shopping center for launches'.
  227. >
  228. >>Does this mean I can bid my Saturn Derived Vehicle (SDV) ?
  229. >
  230. >I would encourage you to. Although I doubt very much you can beat
  231. >Zenith Star launcher prices.
  232. >
  233. >   Allen
  234. >-- 
  235. >+---------------------------------------------------------------------------+
  236. >| Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  237. >|  aws@iti.org     |  put a man on the Moon?"                               |
  238. >+----------------------251 DAYS TO FIRST FLIGHT OF DCX----------------------+
  239.  
  240.  
  241. -- 
  242. <------------------------------------------------------------------------->
  243. Greg d. Moore                  |  Strider@acm.rpi.edu
  244. Green Mountain Software        |  "All that is gold does not glitter."  
  245. Carpe Diem                     | 
  246.  
  247. ------------------------------
  248.  
  249. Date: 15 Aug 92 21:59:25 GMT
  250. From: "Allen W. Sherzer" <aws@iti.org>
  251. Subject: ACRV/Soyuz P # of Passengers
  252. Newsgroups: sci.space
  253.  
  254. In article <_kbyx3j@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  255. >In article <1992Aug14.152325.29323@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  256. >>In article <h-aym4#@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  257. >>
  258. >>>    Soyuz is great, Soyuz is God, Soyuz can carry ONE passenger.  The
  259. >>>other two occupants must be qualified as pilots.
  260. >>
  261. >>>    The Shuttle is lousy, the shuttle is the eater of money, the shuttle
  262. >>>can carry 5 passengers (or more).  
  263. >>
  264. >>I would like to see a source for this. The Soviets tended to prefer automated
  265. >>hardware and didn't let their crew do much if they could avoid it. There
  266. >>shouldn't be too much trouble qualifying crews.
  267. >>
  268. >
  269. >    Source? Look at any Soyuz flight.  If it were so easy, I'd think that
  270. >the CIS would be willing to fly TWo paying passengers, rather than one.
  271. >Also, looking at I believe the last 4 or so missions I recall 2 were done
  272. >with manually docking.  Finally, recall Mercury and the Capsule passengers?
  273. >Oh, excuse me, the ASTRONAUTS who fought to have flight control.  Trying
  274. >to convince NASA and/or its astronauts to sit in a capsule while it flies
  275. >without I think would be harder than convincing Congress of your ideas.
  276. >
  277. >>But I point out that if in fact you are correct, this is still a problem
  278. >>for Shuttle. Soyuz WILL be the ACRV. Congress isn't going to fund anything
  279. >>else.
  280. >>
  281. >    This was my fault, the subject is misleading.  As ACRV I do believe
  282. >that Soyuz has its merits.  As a method for exchanging crews, I have serious
  283. >doubts.  And you haven't made an argument yet.  Just some simple handwaving
  284. >about how easy it would be to qualify crews and that it would all be done
  285. >automatically.
  286. >    Heck, the shuttle can fly automatically except for landing gear
  287. >deployment (and that will change soon).  Why bother flying with a 
  288. >Commander AND a pilot.  Heck, dumpt them and you have 7 or more passengers.
  289. >
  290. >>Therefore if this is a problem, both approaches will sove it the same
  291. >>way.
  292. >>
  293. >    Not sure what you are saying here?
  294. >
  295. >>>    With shuttle, you only need one shuttle flight.  AND the shuttle can
  296. >>>supply the station in the same flight.  
  297. >>
  298. >>And if we have enough money that we don't mind wasing most of it, this
  299. >>is just fine.
  300. >>
  301. >    I've just demonstrated that your costs may be higher than you're
  302. >admitting, and all you can do is say how much the shuttle can costs.  You've
  303. >gone from 2 Soyuz flights (3+1 or 2+2) to recrew the station to possibly as
  304. >many as 4, doubling your cost of Soyuz.
  305. >
  306. >>>    If the station EVER (and I doubt this for a LONG time) gets to 
  307. >>>8-person capability you will need 6 Soyuz flights to recrew.  
  308. >>
  309. >>I'm assuming three although even with six we still save money.
  310. >>
  311. >>>    An added cost comes up with these multiple flights.  
  312. >>
  313. >>In ten years of operation Shuttle has not come down in price very much.
  314. >>As to additional flights reducing cost, it won't happen since Shuttle if
  315. >>flying at maximum rate now and CAN'T fly any more.
  316. >>
  317. >    Non-Sequitor.  I never argued that shuttle costs would come down.
  318. >I argued that your non-hardware costs would go UP.  Assuming you want to
  319. >change the crew within a short period of time (i.e. in a week or so) you've
  320. >got to launch 4 Soyuz's in the space of a week.  HOW?
  321. >
  322. >>>Before you argue
  323. >>>that costs would go DOWN as a result of a larger production line, keep in mind
  324. >>>that you will need more launch pads, more ground support, etc.  
  325. >>
  326. >>A government report (I think it was 'Launch Options for the Future') said
  327. >>that there is plenty of facilities available to greatly increase the
  328. >>rate of Atlas launches. HL Delta goes up from an unused launch complex and
  329. >>all the costs you mention are included.
  330. >>
  331. >    As you mention in a later post, there are ADDITIONAL facilities
  332. >around, I would not say PLENTY!
  333. >
  334. >>>You can't 
  335. >>>simply double or triple the flight rate of any rocket without taking into
  336. >>>account the cost of these factors.  Therefore, I don't think your savings in
  337. >>>production quantity would help, it would end up being eaten in launch support
  338. >>>costs.
  339. >>
  340. >>The relevant government reports says larger launch rates can be sustained.
  341. >>This will provide better utilization of ground facilities which will reduce
  342. >>costs even more.
  343. >>
  344. >>>    Finally, as my recent post concering the EOS system asks, why is the
  345. >>>cost so low.  
  346. >>
  347. >>1. It is a commercial procurement. The government isn't buying a launcher
  348. >>but launch services. If the contractor doesn't deliver the payload, he
  349. >>doesn't get paid. The govenrment will not be paying for the development
  350. >>of HL Delta nor will it own the design. The contractor has every incentive
  351. >>to keep costs in line since he looses $$ otherwise.
  352. >>
  353. >    Sorry, my argument was not clear here.  EOS should be handled the
  354. >same way your are arguing for HL Delta etc.  But, clearly the government
  355. >does NOT want to work this way.
  356. >    One poster sent me a message explaing partly why.  It's typical for
  357. >contractors to underbid and ask for more money later.  And I think this would
  358. >happen with McDonnell Douglas.  "Well, gee, we underbid and well, we are
  359. >going to lose so much money that A) we can't build what you want and B)
  360. >we're going to go out of business, taking hundreds of jobs with us."
  361. >
  362. >    And what has the government done in the past?
  363. >
  364. >>2. The vehicles in question use mostly off-the-shelf parts with wide safety
  365. >>margins. This works to reduce costs and increase reliability.
  366. >>
  367. >>>    Your answer taht you've talked to teh engineers, ro that Boeing does
  368. >>>it with aircraft all the time doesn't hold water with me.  First:  the
  369. >>>companies in question have a tradition of giving lower figures, why change
  370. >>>now?  
  371. >>
  372. >>Because the rules are different. Before with cost plus contracts it was
  373. >>to a companys advantage to add costs. With this effort where only services
  374. >>are being purchased, that won't work.
  375. >>
  376. >>>Two: Boeing is operating in the real world with real customers who
  377. >>>WON'T allow them to underbid and get away with it.
  378. >>
  379. >>EXACTLY. Since we are making the government a real customer it will
  380. >>work just like Boeing. Now the govenrment is simply another buyer of
  381. >>launch services just like Intelsat (which McDonnell Douglas and GD
  382. >>already serve).
  383. >>
  384. >>Don't get hung up on HL Delta or Atlas. We aren't paying to develop
  385. >>them. All we are doing is buying launch services from the lowest bidder
  386. >>and it may not be either of those vehicles who get the contract.
  387. >>
  388. >    Me hung up?  Look around. :-)
  389. >
  390. >>   Allen
  391. >>-- 
  392. >>+---------------------------------------------------------------------------+
  393. >>| Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  394. >>|  aws@iti.org     |  put a man on the Moon?"                               |
  395. >>+----------------------252 DAYS TO FIRST FLIGHT OF DCX----------------------+
  396. >
  397. >
  398. >-- 
  399. ><------------------------------------------------------------------------->
  400. >Greg d. Moore                  |  Strider@acm.rpi.edu
  401. >Green Mountain Software        |  "All that is gold does not glitter."  
  402. >Carpe Diem                     | 
  403.  
  404.  
  405. -- 
  406. +---------------------------------------------------------------------------+
  407. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  408. |  aws@iti.org     |  put a man on the Moon?"                               |
  409. +----------------------251 DAYS TO FIRST FLIGHT OF DCX----------------------+
  410.  
  411. ------------------------------
  412.  
  413. Date: 15 Aug 92 22:18:37 GMT
  414. From: "Allen W. Sherzer" <aws@iti.org>
  415. Subject: ACRV/Soyuz P # of Passengers
  416. Newsgroups: sci.space
  417.  
  418. In article <1kbya_k@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  419.  
  420. >>A simple return craft can be built to return these payloads in a suitable
  421. >>environment. Estimate the cost of this anyway you want.
  422.  
  423. >    Hmm, sorry, I don't have my figures for EVA handy. 
  424.  
  425. Well when you can attach numbers to your complaint I will address it.
  426. Otherwise, it can't be considered credible.
  427.  
  428. >>Since it achieves less reliability than commercial systems costing a fraction
  429. >>as much I don't think it is anything to boast about. Let's see it go on
  430. >>for a few years.
  431.  
  432. >    How? If you kill it?  Compare the reliability of the first 50 flights
  433. >of the shuttle with the first 50 of any booster.  When we get more 
  434. >shuttle flights under our belt, we use that as a better data set.
  435.  
  436. Shuttle deserves to die on the basis of cost alone. Its generally
  437. poor relaiblity is just iceing.
  438.  
  439. >>HL Delta would use Complex 37. As for Atlas, the report I mention does
  440. >>say that the additional six flights can be acheived.
  441. >>
  442. >    Ok, so, let's see... under YOUR plan, you need at least 2 Soyuz
  443. >flights to recrew that station, 4 times a year.. gives 8 flights.  Ok,
  444. >so where do the extra 2 come from? 
  445.  
  446. They go up on the HLV along with the resuply.
  447.  
  448. > Given my numbers of min 3 flights
  449. >gives you 12 flights a year, twice the 6 you quote. 
  450.  
  451. Only eight Soyuz are needed. If we need 12, that simply raises the cost to
  452. $1.6 billion per year. Instead of saving $ billion per year we will only
  453. save $3.4 billion.
  454.  
  455. >Now, where do we
  456. >launch the Progress and other resupply flights?
  457.  
  458. the HLV of course.
  459.  
  460. >What happens
  461. >when an Atlas is grounded (for whatever reason, I believe that you are
  462. >reasonable enough to admit that sometimes ANY booster can be delayed 
  463. >somewhat) on the pad you're planning on launching your resupply mission?
  464.  
  465. Since it can happen to any vehicle it can happen to Shuttle. Since we
  466. resuply with unmanned vehicles, gounding is a far more serious problem
  467. for Shuttle.
  468.  
  469. I also point out that unlike Shuttle, the alternate approach has
  470. backups and assumes things will fail. If Shuttle fails, your dead
  471. in the water. If Atlas fails, you launch on Titan. If HL Delta
  472. fails, you use Titan V.
  473.  
  474. >>What isn't there is included in the estimated development costs. Like I
  475. >>said, the HL Delta designers know what they are doing.
  476.  
  477. >    I've neer seen you quote the money to be spend on intergration
  478. >facilities, etc.  
  479.  
  480. Nevertheless they ARE included.
  481.  
  482. >>Look, McDonnell Douglas offered the government 20 HLV flights at a fixed
  483. >>price.
  484.  
  485. >    Oh Allen? What do we need 20 flights for?  
  486.  
  487. That represents ten years of station resuply.
  488.  
  489.     Allen
  490.  
  491. -- 
  492. +---------------------------------------------------------------------------+
  493. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  494. |  aws@iti.org     |  put a man on the Moon?"                               |
  495. +----------------------251 DAYS TO FIRST FLIGHT OF DCX----------------------+
  496.  
  497. ------------------------------
  498.  
  499. Date: 15 Aug 92 22:20:03 GMT
  500. From: "Allen W. Sherzer" <aws@iti.org>
  501. Subject: ACRV/Soyuz P # of Passengers
  502. Newsgroups: sci.space
  503.  
  504. In article <_kbyx3j@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  505.  
  506. >>I would like to see a source for this. The S[Soyuz must have 2 pilots]
  507.  
  508. >    Source? Look at any Soyuz flight.
  509.  
  510. In other words, you don't have a source.
  511.  
  512. >  If it were so easy, I'd think that
  513. >the CIS would be willing to fly TWo paying passengers, rather than one.
  514.  
  515. They don't fly two paying passengers because the other two are needed to keep
  516. Mir operating. the passenger stays up a few days and returns with the
  517. other crew.
  518.  
  519. >to convince NASA and/or its astronauts to sit in a capsule while it flies
  520. >without I think would be harder than convincing Congress of your ideas.
  521.  
  522. We aren't talking about astornauts. Soyuz doesn't need two pilots.
  523.  
  524. >    I've just demonstrated that your costs may be higher than you're
  525. >admitting, and all you can do is say how much the shuttle can costs.  You've
  526. >gone from 2 Soyuz flights (3+1 or 2+2) to recrew the station to possibly as
  527. >many as 4, doubling your cost of Soyuz.
  528.  
  529. We need eight Soyuz flights to provide crew rotation. Two go on HLV
  530. and the rest go on Atlas. The HLV also provides logistics. This adds
  531. up to about $1 billion per year. Doubling the number of Atlas flights
  532. brings the cost to $1.6 billion; still a bargin.
  533.  
  534. >    Non-Sequitor.  I never argued that shuttle costs would come down.
  535. >I argued that your non-hardware costs would go UP.  
  536.  
  537. You did assert that but the government estimates of Atlas launch capicity
  538. don't bear those assertions out. It is therefore not a problem.
  539.  
  540. >Assuming you want to
  541. >change the crew within a short period of time (i.e. in a week or so) you've
  542. >got to launch 4 Soyuz's in the space of a week.  HOW?
  543.  
  544. We don't. We launch one every siz weeks and rotate crew that way. This 
  545. may even be to our advantage since Freedom will then have somebody who
  546. has been around for a while on board. This experience could be valuable
  547. in repair and other activities.
  548.  
  549. >    Sorry, my argument was not clear here.  EOS should be handled the
  550. >same way your are arguing for HL Delta etc.  
  551.  
  552. Indeed it should.
  553.  
  554. >But, clearly the government does NOT want to work this way.
  555.  
  556. With the exception of payloads which MUST go on the Shuttle, the
  557. government is REQUIRED to act the way I propose according to public
  558. law 101-106.
  559.  
  560. Freedom resuply does not need to go on Shuttle.
  561.  
  562. >    One poster sent me a message explaing partly why.  It's typical for
  563. >contractors to underbid and ask for more money later.
  564.  
  565. When the government is paying for hardware to be developed this can indeed
  566. happen. This can't happen when the government is only buying services. Like
  567. anything else, if the service is not provided, the contractor isn't paid.
  568.  
  569. >    And what has the government done in the past?
  570.  
  571. since you ask, when the government buys launch services instead of launchers
  572. it generally saves 30 to 50%.
  573.  
  574.    Allen
  575.  
  576. -- 
  577. +---------------------------------------------------------------------------+
  578. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  579. |  aws@iti.org     |  put a man on the Moon?"                               |
  580. +----------------------251 DAYS TO FIRST FLIGHT OF DCX----------------------+
  581.  
  582. ------------------------------
  583.  
  584. Date: 15 Aug 92 15:40:27 GMT
  585. From: Gary Coffman <ke4zv!gary>
  586. Subject: Energya and Freedom and Soyuz ACRV and...
  587. Newsgroups: sci.space
  588.  
  589. In article <2943@mdavcr.mda.ca> garry@mdavcr.mda.ca (Garry Holmen) writes:
  590. >Reading the subject header of this posting gave me a great idea....
  591. >
  592. >Why don't we just strap the shuttle onto the Energia and throw the soyuz into
  593. >the shuttle's cargo bay. This takes care of heavy lift capability, cheap
  594. >escape vehicles and low G returns of space hardware. I'm sure we can get 
  595. >that fellow from South Africa to supply the propellent for the whole project
  596. >if we donate the raw sugar, salt peter and a large candle.
  597. >
  598. >The total price for this scheme would be :
  599. >
  600. >    Energia        2 pairs 501 jeans and Rolling stones CD
  601. >            ( equivalent to 10,000,000 rubles in the black market)
  602. >        
  603. >    Shuttle        1 Billion US $. (No red tag special here....)
  604. >
  605. >    Soyuz        Macdonald franchise for St. Petersburg.
  606. >
  607. >for a grand total of     1 billion plus spare change.
  608. >      plus tax        3 billion.
  609. >
  610. >(PS.... I think Allen can get all this for about 200M if we just let him
  611. >work with the numbers for awhile.)
  612.  
  613. Well that sounds like a plan, but there's another way that doesn't
  614. require any engineering work to mate all that hardware. The Shuttle's
  615. current high launch cost is mostly labor, a new ET and fuel are piddling
  616. expenses. So let's fire all those Rockwell guys and hire Russian rocket
  617. scientists, they work for $12 a month. A Shuttle launch then runs about
  618. $10 a pound. Can anyone say "too cheap to meter"? I knew you could.
  619.  
  620. You say Russian labor costs are going to go up now that they are becoming
  621. a free market economy? Damn right! And the price of Energia and Soyuz
  622. are going to skyrocket right along with those wages. *That's* the flaw
  623. in the "let the Russians do it" plans. We can refine and bend metal as
  624. cheaply as anyone. It's the skilled labor costs that make the difference.
  625.  
  626. Gary
  627.  
  628. ------------------------------
  629.  
  630. Date: 15 Aug 92 16:20:25 GMT
  631. From: Gary Coffman <ke4zv!gary>
  632. Subject: NASA statement on Earth Data System proposals [NTE 92-71] (Forwarded)
  633. Newsgroups: sci.space
  634.  
  635. In article <===yk+h@rpi.edu> strider@acm.rpi.edu (Greg Moore) writes:
  636. >In article <1992Aug13.043115.27308@news.arc.nasa.gov> yee@trident.arc.nasa.gov (Peter E. Yee) writes:
  637. >    [stuff deleted for brevity's sake and Mike's sake]
  638. >
  639. >>    As prescribed by NASA source selection regulations, 
  640. >>the evaluation of proposals included a "most probable 
  641. >>cost" analysis of each proposal as reflected in the 
  642. >>"best and final offers" submitted by the offerers.  
  643. >>Despite NASA's repeated attempts during the solicitation 
  644. >>and evaluation processes to encourage the submission of 
  645. >>realistic cost estimates, the government's analysis 
  646. >>clearly indicates that the offerers significantly 
  647. >>underestimated the cost of the respective technical 
  648. >>approaches.  Accordingly, NASA is unwilling to select an 
  649. >>offerer for further negotiations leading to award of a 
  650. >>contract.
  651. >>
  652. >    Now, am I reading this right?  Every submitter said they 
  653. >could do it for around $X and NASA and the government is saying,
  654. >oh no... you can't do it for $X, it's a lot more than that!  Until
  655. >you say it will cost more we won't award the bid.
  656. >
  657. >    It seems to me that if EVERY contractor said they could do
  658. >it cheaper than the government says it will cost, maybe the 
  659. >contractors know something?  After all, I'm sur they are in there
  660. >to make money, not lose it.
  661. >
  662. >    I can understand if one company was way low.  In that case,
  663. >sure you probably don't want to go with the lowest bidder.  But if
  664. >EVERY company is way low? Come on.
  665. >
  666. >So, please, if I'm misunderstanding this, please let me know why
  667. >the goverment wants to spend more money?
  668. >(And no, the answer is not that every company is using Soyuz. :-)
  669.  
  670. A thorny problem the government faces in all cost plus development
  671. contracts is the practice of low balling the original figure then
  672. jacking up costs as the program progresses. With a cost plus deal
  673. a company can't lose at this game. NASA has decided in this case
  674. that it doesn't want to play the escalation game and get embarressed
  675. in fromt of Congress yet again when huge cost overruns appear down
  676. the road. They're telling the bidders that their lies are too blatent
  677. this time and NASA isn't going to play.
  678.  
  679. They could put the project out as a fixed price procurement, but that's
  680. risky in a developmental project. They could end up paying out a lot of
  681. progress payments and not wind up with a system that met their needs.
  682.  
  683. Gary
  684.  
  685. ------------------------------
  686.  
  687. Date: 15 Aug 92 15:11:08 GMT
  688. From: Gary Coffman <ke4zv!gary>
  689. Subject: SPS feasibility (WAS: SPS fouling astronomy)
  690. Newsgroups: sci.space
  691.  
  692. In article <Bsxo2q.MJy@fmsrl7.srl.ford.com> wreck@fmsrl7.srl.ford.com (R. Cage) writes:
  693. >In <1992Aug13.075037.2707@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  694. [deleted]
  695. >
  696. >Also, you have the earth's energy budget wrong.  The disc area
  697. >is about pi * (6.4e6 m)^2, or 1.28e14 square meters.  The solar
  698. >constant is about 1360 W/m^2, so we get about 1.75e17 watts, or
  699. >175,000 TW of incident sunlight.  Not 140 TW.  You're off by 3
  700. >orders of magnitude!
  701.  
  702. Yeah I know. :-( I calculated in English units for Earth's area and
  703. screwed up the conversion to square meters. Heat load isn't a significant
  704. factor in any event, even with my wrong numbers it's still piddling.
  705.  
  706. >Adding another 4 TW of heat is literally a drop in the bucket.
  707. >Spread it out and you'll have a very hard time detecting it.
  708.  
  709. Yep.
  710.  
  711. >>By contrast, for Earth based solar collection, there is no net increase 
  712. >>in heat flux. The energy is striking the planet anyway whether we use it 
  713. >>or not.
  714. >
  715. >3.)    You're assuming that the albedo of the earth's surface and
  716. >    a solar collector are the same.
  717. >    
  718. >In a word, WRONG!  Solar collectors are a lot blacker than most things.
  719. >
  720. >If you counter that the collectors can be interspersed with light
  721. >colored areas to reflect light and keep the balance the same, you
  722. >can do that without solar collectors too.  It's not an argument
  723. >for ground-based.
  724.  
  725. No, all energy that reaches Earth's surface is eventually re-radiated
  726. to space. The time scale is different if it is immediately reflected
  727. rather than being used as electricity first, but that doesn't matter
  728. to the long term energy balance. It's still a piddling amount as you
  729. noted above.
  730.  
  731. >>Now what's happening on the Moon? Gas lasers are very inefficient devices. 
  732. >
  733. >Free-electron lasers aren't.  Neither are amplitrons.
  734. >
  735. >>I don't have CO2 numbers at hand, but He-Ne efficiencies are around 0.1%. 
  736. >
  737. >I believe CO2 lasers have reached 20%; someone please correct me.
  738. >
  739. >>Now solar energy striking the top of the Earth's atmosphere, or 
  740. >>the surface of the Moon, is 1 kW/m^2.
  741. >
  742. >Close enough.
  743.  
  744. Yeah it's 1.4 but round numbers are close enough for this calculation.
  745.  
  746. >>So our 1 TW delivered to the busbar on 
  747. >>Earth requires a solar collector area of 1E14 square meters on the Moon.
  748. >
  749. >This assumes a system efficiency of 1%.  That is about 10x too low.  Solar
  750. >cells are over 20%, conversion equipment to microwaves is well over 50%.
  751.  
  752. Actually that's an efficiency of 6% total from Lunar solar capture to
  753. Earth busbar. The figure includes Lunar photovoltaics or thermal at
  754. roughly 30% efficiency and CO2 lasers at 10%. It doesn't include any
  755. transmission or conversion losses at either end. The number could be
  756. 2X either way and still be reasonably close. Since this is the Loony
  757. Laser we're debunking, microwaves don't count.
  758.  
  759. >>requires a square 10,000 km on a side, or about 6,000 miles on a side. Sorry 
  760. >>gentlemen, the Moon isn't that big.
  761. >
  762. >More like 3,000 km on a side.  Just about the area of Luna.
  763.  
  764. Numbers could be 2X either way. That's still a near *planetary* body
  765. we're talking about plating with solar cells in any case. That's so
  766. unreal I'm surprised *anyone* would seriously consider it.
  767.  
  768. >>Now if we discard the laser, the Moonbase 
  769. >>with it's 6000 mile on a side collector, and simply use the same collector 
  770. >>field we were going to use for the laser on Earth, we still gather in 1E10 
  771. >>watts, or 10 GW, and we haven't spent an improbable fortune on the Moon.
  772. >
  773. >You can't use the same collector.  It's out of the sun a lot more than
  774. >half the time, has to be built to deal with WATER and WIND, and a whole
  775. >lot of other things that limit its life and output.  Vacuum and low G
  776. >has the advantage that it's very friendly to most equipment.
  777.  
  778. No, it *is* the same collector. The one on Earth to catch the *laser*
  779. beam from the Moon. It's already built to deal with the elements. It's
  780. only 6 miles on a side.
  781.  
  782. >>A Lunar collector array would be in darkness 2 weeks out of 4, so storage
  783. >>for two weeks would be required on Earth.
  784. >
  785. >Wrong.  You'd put collectors on both sides of the moon.  When power
  786. >is only hitting the far side, it's the far side collectors which feed
  787. >the transmitters.  Transmission lines are easy in 1/6 G and vacuum.
  788.  
  789. Plate the *whole* Moon? Really now. Transmission lines would have to
  790. be superconductive in any case at the power levels we're talking about.
  791. 1/6 G doesn't really enter in, the damn things would have to be buried
  792. below the solidly plated surface. Vacuum could be useful for the cryogenics.
  793.  
  794. >>Therefore, at least half of
  795. >>Earth's capture arrays would be in daylight at any given moment. That's
  796. >>at least 7 times better than the Loony Laser.
  797. >
  798. >Wrong.  Receivers not in direct view of Luna could be fed by
  799. >reflectors (easy for lasers, a little harder for microwaves).
  800. >If a receiver can take a feed from more than one reflector at
  801. >a time, then interruptions from the reflector going behind
  802. >Earth as seen from Luna will be avoidable.
  803.  
  804. Ok, now you're going to orbit huge reflectors as well as plate the
  805. Moon with solar cells. Note that reflectors capable of handling
  806. terawatts are tricky beasts at best. 
  807.  
  808. >>But solar *thermal* is workable *today* in certain cases.
  809. >
  810. >Yes, mostly peaking power or fossil displacement.  Not replacement,
  811. >not base-load.  The whole point of Lunetta or SPS is base-load power.
  812. >
  813. >IMHO, if there is the capability to build that much collector
  814. >area on the moon, a single catapult can put it into orbit and
  815. >leave it in sunlight 24 hours per day, all month.  Having many
  816. >feed angles and immunity from lunar eclipses and beam
  817. >occultation by Earth is another big advantage.  This is why I
  818. >think SPS has a better future than Lunetta.
  819.  
  820. A few fast breeders deal with the problem with *today's* technology 
  821. for *trillions* less. I think that they're *all* loony.
  822.  
  823. Gary
  824.  
  825. ------------------------------
  826.  
  827. Date: 15 Aug 92 21:38:04 GMT
  828. From: "Allen W. Sherzer" <aws@iti.org>
  829. Subject: U.S. Go'vt Procurement (was: Energiya's role in Space Station assem)
  830. Newsgroups: sci.space,talk.politics.space
  831.  
  832. In article <1992Aug15.203909.12541@aio.jsc.nasa.gov> kjenks@gothamcity.jsc.nasa.gov writes:
  833.  
  834. >Dan Goldin, in a recent press release, announced that he's going to
  835. >reform NASA procurement practices.  I don't know how, since NASA is
  836. >bound by the same laws as everybody else (except Congress).
  837.  
  838. Goldin CAN set up a different system if he wants. Most of this is federal
  839. regulation and not law. 
  840.  
  841. The advantage of the FAR's is that it keeps your ass well covered. If your
  842. project fails miserably but you followed the FAR to the letter, your safe
  843. and can even be promoted (as has happened).
  844.  
  845. You can choose not to follow the FAR if you want but your ass is no longer
  846. covered.
  847.  
  848.   Allen
  849. -- 
  850. +---------------------------------------------------------------------------+
  851. | Allen W. Sherzer | "If they can put a man on the Moon, why can't they     |
  852. |  aws@iti.org     |  put a man on the Moon?"                               |
  853. +----------------------251 DAYS TO FIRST FLIGHT OF DCX----------------------+
  854.  
  855. ------------------------------
  856.  
  857. Date: 15 Aug 92 20:39:09 GMT
  858. From: kjenks@gothamcity.jsc.nasa.gov
  859. Subject: U.S. Go'vt Procurement (was: Energiya's role in Space Station assem)
  860. Newsgroups: sci.space,talk.politics.space
  861.  
  862. In article <1992Aug13.225903.5705@ke4zv.uucp> gary@ke4zv.UUCP 
  863. (Gary Coffman) challenges us to:
  864. >                         Name *one* major military procurement that
  865. >proceeded on a fixed price basis with *no* adjustments. Congress is
  866. >notorious for "stretching out" procurement in a way that saves money
  867. >this year, but adds horrible extra costs in the "out years" if the
  868. >full procurement ever is actually filled. Recent examples include B1B, 
  869. >B2, and Seawolf. ATF is travelling down the same road.
  870.  
  871. FAR be it for me to defend the procurement system with which Congress
  872. has saddled the rest of the U.S Government, but you do get a very
  873. skewed view of the process by reading about it in the Press.  The Press
  874. is only interested in stories that are "news," and procurement actions
  875. which are on-time and under-budget are not considered newsworthy.
  876.  
  877. Challenging us to name a "major military procurement" which worked
  878. "properly" is quite a challenge, since we never hear about them if
  879. everything goes well.  I'd point to NASA's recently-completed $2B
  880. purchase of OV-105 (Endeavour), but since NASA did the final work on
  881. the new Orbiter at KSC, it's debatable whether Rockwell really did come
  882. in on-time and under-budget.  (It's hard to tell when the rules change
  883. in mid-contract, and they always change on a big procurement.)
  884.  
  885. The U.S. space program operates under the same procurement regulations
  886. that DoD and the Department of Agriculture do.  Whether it's rockets
  887. or bullets or tractors, it's the lowest qualified bidder, or you'd
  888. better have a darned good JOFOC (that's Governmentese for Justification
  889. for Other than Full and Open Competition).
  890.  
  891. Dan Goldin, in a recent press release, announced that he's going to
  892. reform NASA procurement practices.  I don't know how, since NASA is
  893. bound by the same laws as everybody else (except Congress).  I applaud
  894. him for the effort, but true changes can only come from Congress, and
  895. they have so much crap built into the procurement rules, they'll never
  896. get rid of it all.
  897.  
  898. On the sunny side, it looks as though Dan Quayle, Friend of the Space
  899. Program, may come to the rescue.  His "National Council on
  900. Competitiveness" is taking a serious look at procurement reform.  I
  901. doubt he'll be able to get anywhere, either, but at least he's trying.
  902.  
  903. Let's take this to talk.politics.space where it belongs.
  904.  
  905. -- Ken Jenks, NASA/JSC/GM2, Space Shuttle Program Office
  906.       kjenks@gothamcity.jsc.nasa.gov  (713) 483-4368
  907.  
  908.      "Better.  Faster.  Cheaper." -- Daniel S. Goldin, NASA Administrator
  909.  
  910. ------------------------------